Overview

The Project Management Team was established to support and guide the physical development of Governors State University. The team provides services necessary in the design and implementation of construction projects from the conceptual phase of a project through the closeout. The Project Management Team provides the appropriate support tools to effectively manage construction projects allowing the project to be completed successfully, on time and within budget.

Completed Projects

Alumni Path Lighting

 

PROJECT TYPE: GSU Internal

PROJECT NUMBER: D1907TMS

PROJECT BUDGET: Not to Exceed $806,227

ARCHITECT/ENGINEER: Primera Engineers, LTD | Chicago, Illinois

CONTRACTOR - ELECTRICAL:
Excel Electric

GENERAL DESCRIPTION: 

 
On the campus, GSU has a pedestrian walkway called the “Alumni Path". From dusk until dawn, the entire length of the path gets very dark. This was cited as a safety concern for students. This project will add solar-powered lighting to the walkway as drawn and defined. Project also includes the “Alumni Extension Path.” Outdoor Emergency telephones are also in project scope.

CURRENT PROJECT STATUS: COMPLETE

PHOTOS, DRAWINGS & RENDERINGS:  

Alumni Path Looking West During Afternoon

Alumni Path, Looking West in Afternoon


 

Alumni Path Looking West at Night
Alumni Path, Looking West at Night


Alumni Path's New Light Poles at Night
Alumni Path, New Light Poles at Night


Alumni Path Emergency Phone
Alumni Path, Emergency Phone 

 

Main Building Roof Replacement Phase 1 (C and E)

 

PROJECT TYPE: GSU Internal


PROJECT NUMBER: N/A

PROJECT BUDGET: $1,413,830.00

ARCHITECT/ENGINEER: Inspec | Chicago, Illinois

GENERAL DESCRIPTION:

The Governors State University Phase 1 Complex, constructed circa 1974, is a multi‐story complex of six interconnected units. Two additions were built in subsequent years including the Center for Performing Arts. The units are divided by elevation changes and area separation walls at the roof level. Interior spaces in these areas had been experiencing chronic damaging water leaks.

ROOF AREA:

This project provides for complete Roof System replacement at Building “C” and Building “E”.

SCOPE OF WORK:

Scope of work calls for the removal and replacement of the entire roof assembly down to the structural concrete deck

CURRENT PROJECT STATUS:

COMPLETE

PHOTOS, DRAWINGS & RENDERINGS:
Excessive Water Ponding On Roof E
Excessive Water Ponding on "E" Roof, Prior to Recent Project


Excessive Water Ponding on Roof C
Excessive Water Ponding on "C" Roof, Prior to Recent Project


Issues Remediated On Roof E
Issues Remediated on "E" Roof, Post-Construction


Issues Remediated On Roof C
Issues Remediated on "C" Roof, Post-Construction 

 

Main Building Roof Replacement Phase 2 (A, B, and CPA)

 

PROJECT TYPE: Illinois Capital Development Board (CDB)


PROJECT NUMBER: 816-010-041

PROJECT BUDGET: $2,964,940.00

ARCHITECT/ENGINEER:
Doyle & Associates | Chicago, Illinois

GENERAL DESCRIPTION:

The Governors State University Complex, constructed circa 1974, is a multi‐story complex of six interconnected units. Two additions were built in subsequent years including the Center for Performing Arts. The units are divided by elevation changes and area separation walls at the roof level. Interior spaces in these areas have been experiencing chronic damaging water leaks.

ROOF AREA:

This project provides for complete Roof System replacement at Building “A”, Building “B” and the Center for Performing Arts.
Building “A” consists of six distinct roof areas for a total of 47,160square feet. Roof Areas A‐2 and A‐5 are elevated 7’ above the adjacent roof areas. Building “B” consists of three distinct roof Areas for a total of 28,568square feet. Roof A‐3 is depressed slightly and constrained by an area separation curb and existing windows.
The Performing Arts Center “PA” consists of eight roof areas for a total of 20,172 square feet. Roof Area PA‐1 sits atop the fly tower.
The total estimated roof area of 95,900 square feet is part of this project’s scope for roof replacement. This total contradicts the 75,500 square feet referenced in the original RFQ.

SCOPE OF WORK:

Scope of work calls for the removal and replacement of the entire roof assembly down to the structural concrete/metal deck. A predetermined square footage will be built into the project to address any unforeseen repairs to the concrete and/or metal deck due to water saturation below the insulation.

CURRENT PROJECT STATUS:

COMPLETE

PHOTOS, DRAWINGS & RENDERINGS:
Exposed Tar On Roof A
Exposed Tar Deterioration on "A" Roof


Excessive Ponding On Roof A

Excessive Ponding on "A" Roof 


 

Main Entrance HVAC/Heating Improvements

 

PROJECT TYPE: GSU Internal


PROJECT NUMBER:
B20201TMS

PROJECT BUDGET:
$23,436

ARCHITECT/ENGINEER:
Spagnolo Enterprises | Park Ridge Illinois

CONTRACTOR: Temperature Doctors

GENERAL DESCRIPTION:

The main “D” entrance to the university is closest to the hub of student activities and thus has the heaviest volume of pedestrian traffic. During the winter, the perpetual opening of the entrance doors allows cold weather to infiltrate the interior Information Desk and Admission Office areas. Employees and visitors are burdened with a chronic chill. Project goal is to mitigate the cold interior temperatures.

SCOPE OF WORK:

Replace two vestibule unit heaters, add baseboard heaters beneath the Student Central and Admission counters, replace ceiling unit heater across from Financial Aid window

CURRENT PROJECT STATUS:

COMPLETE

PHOTOS, DRAWINGS & RENDERINGS:
Main Entrance in D Building
"D" Main Entrance Slated for HVAC Upgrade


Project Team

 

John Potempa - Associate Vice President FDM
Phone: 708.235.7447
Email: jpotempa2@govst.edu

Carolyn Johnson - Director of Environmental Health & Safety
Phone: 708.235.6971
Email: cjohnson33@govst.edu

Louis Schultz - Architectural Superintendent, FDM
Phone: 708.235.7448
Email: lschultz@govst.edu

Michael Sullivan - Chief Engineer, FDM
Phone: 708.235.2109
Email: msullivan@govst.edu

James Zumerchik
Director of Project Management / Campus Architect Planner
Phone: 708.235.7451
Email: jzumerchik@govst.edu

Donna Gill
Environmental Health & Safety Coordinator
Phone 708.534.6366
Email: dgill3@govst.edu